Skip to content
Durham Region, By-law 24-2018

Backflow testing in Pickering

Pickering is on Regional water and sits under Durham Region By-law 24-2018 like every other municipality in the Region. There is no separate Pickering backflow program. Every ICI and multi-residential building on Regional water here has its device tested once a year and the report filed with the Region.

One program for all of Durham Region

The testing requirement in Pickering is set by Regional Municipality of Durham By-law 24-2018, the same by-law that covers every other Durham municipality. Notices come from BSI Online on the Region's behalf, reports are filed through the same portal, and the Region issues the tag. There is no separate Pickering program. See the Region's program page for the by-law and the tester registry.

Pickering’s building stock, from a backflow point of view

Pickering runs from lakeshore industrial to a dense city centre to brand-new employment lands in the north:

  • Brock Road and Bayly Street industrial. The established employment area along the 401: manufacturing, warehousing, services, and the supply chain around the nuclear generating station and its refurbishment. Multi-device sites are the norm. The Brock Road corridor works the city has planned for 2026 and 2027 may affect access timing on some sites; tell us if construction is on your doorstep. See the industrial page.
  • The city centre. Office towers, the mall, hotels, restaurants and the condo towers around them. Offices and condos usually a DCVA; hotels and restaurants RPZs on kitchens and boilers.
  • Seaton and the Innovation Corridor. The city’s newer prestige employment lands along Highway 7 and the 407, and the Seaton residential community. Mostly first-cycle tests on new, well-labelled devices.
  • Plazas along Kingston Road, Brock, Liverpool and Whites, with a landlord premise device and tenant devices.
  • Multi-residential across the urban area, from older Bay Ridges apartments to new city-centre towers. See apartments and condos.

The rule is Regional

By-law 24-2018 was passed by Durham Regional Council and is administered through BSI Online. Pickering does not run its own program. The notice page explains the letter; the service page explains the test.

Water context

Pickering’s urban area is served by Regional water from the Region’s Lake Ontario plants. Rural north Pickering is largely on private wells, which are outside the by-law; where a property in the north has a Regional connection, it is inside the program, and if it also has a well the well counts as an auxiliary supply.

Scheduling in Pickering

Urban Pickering batches with Ajax into a lakeshore-west route:

Area Usual pattern
City centre Condos mid-morning; hotel and restaurant RPZs early morning or late evening; offices before staff arrive
Brock Road and Bayly industrial Between shifts or planned outage for premise devices; zone devices during a shift
Kingston Road and other plazas Daytime, landlord and tenant devices together
Seaton and the Innovation Corridor Grouped; new devices, quick visits
Rural north on Regional water Grouped with the next northern run

New employment lands and the first cycle

A large share of Pickering’s coming growth is in Seaton and the Innovation Corridor. New buildings mean new premise devices registered during construction and first tests a year later. New devices almost always pass; the value in the first visit is getting the Region’s record right (owner contact, device details, location) so that year two runs on the reminder rather than the notice.

What it costs and what you get

Per device, per property, $25 BSI filing fee included, report submitted within the by-law’s 28-day window, tag, report copy for the five-year file, filing confirmation, and a reminder 30 days before next year. Details on the cost page.

Scheduling in Pickering

Pickering's urban area batches with Ajax: a day can cover city centre condos, Brock Road industrial and Kingston Road plazas without much driving. Seaton and the Innovation Corridor are newer and growing, with first-cycle tests on new devices. Rural north Pickering has few properties on Regional water; the ones that are get grouped with the next visit north.

Backflow testing in Pickering: questions

Our Pickering property is in Seaton and brand new. Do we have a backflow device?

Almost certainly. Any ICI or multi-residential building on Regional water is required to have a premise isolation device installed (by-law section 3.3), and new construction includes it. It is registered with the Region and its first annual test falls a year after installation. If you have not seen a notice yet, the address is enough for us to check what is on file.

Is rural north Pickering covered?

Only where a property is on Regional water. Claremont, Greenwood, Whitevale and the farms around them are largely on private wells, which are outside the by-law. A property with both a well and a Regional connection is inside it. If you are unsure, the presence of a Regional water bill settles it.

Can you handle a Brock Road industrial site with a dozen devices?

Yes. Premise device between shifts or during a planned outage; zone devices line by line during a shift; all on one visit where the site allows, with a device register at the end. Tell us about lockout, confined space and sign-in requirements when you book.

Get a quote in Pickering

Did you receive a test notice from Durham Region or BSI Online? (required)

Backflow testing in Pickering, booked and filed

Send the address and the notice if you have one. We schedule a slot that suits the building and make sure the report reaches BSI Online.

Call 289-481-0478